All prices exclude VAT and other taxes.
Payment terms are
50% upon order placement
50% when installation is complete
All sizes and specification will be signed off by the client prior to go into production.
Note that products will not go into production until funds have cleared.
We have allowed for the removal of all packaging from site.
All necessary access equipment to carry out the works has be included in tender.
The price is open for 30 days from the date of the estimate.
We reserve the right to change this price following the expiry date of the quotation.
We have made no allowance within our price to protect the works.
Our price is based on the works being carried out during normal working hours.
Our price includes for one continuous visit.
Should we be subjected to an aborted visits due to preceding works being incomplete then the addition cost incurred may be passed on to the relevant parties.
We do not accept any claims of consequential loss unless previously agreed in writing.
We have included that our products be fitted to a suitable structural stable and level substrate.
We have allowed for a final wipe down clean following the installation.
We offer a 24 month guarantee on the product.
All lead in time are guide times and based on recent production dates, we cannot confirm exact dates until the full despots has been paid and a production slot reserved.
We will fix the price for a period of 6 months should the deposit have been paid and the project delayed.
We have no responsibility for site security, this is assumed to be the responsibly of the home owner.
Retention of Title – Where any material and goods have been delivered to site and or incorporated in the works, the title of these goods will remain the property of Core Pergola until full payment is received.
Although the products are an outdoor structure they are not one hundred percent guaranteed to be completely watertight.
All electrical works will be carried out by NICECI approved contractors.
Access will be required to the main electrical distribution board to make main connections.
Electric cables running from the distribution board to the new works face will be concealed where possible.
In the event a site survey is not requested it is assumed that safe access to the working area will be provided.